问题计划的基础 - BOIP

   
A.描述:M1068标准化综合指挥职位(SICP)将提供标准化的业务设施,以提高员工和指挥官在进行C3I活动方面的效力。M1068(这是修改后的M577)将具有新的内部机架,以便储存陆军战术指令和控制系统(ATCC)计算机硬件,配电系统,两个电子设备操作员座椅和指令后帐篷连接到后部载体通过靴子组件。长度为205英寸,宽度为105.8英寸,最小可降低高度为102英寸,净重为24,142磅。电力代码是D2。应该注意的是,初始场地将是当前4.2 kW辅助电源单元,并且将在以后提供5 kW更换。LIN / NSN / PN命名量C40496命令系统:模块化1 B.功能:载体命令帖子,光线跟踪将提高指挥官和工作人员的战术运营能力,为他们提供设备齐全,气候控制,轻松铠装,移动命令帖子。C.就业:SICPS轨道将用于CORCP,司,营,单独的旅,装甲骑兵团和雇用ATCC的公司的ATCC C2职能。D.问题的基础:每载波CMD帖子M1068,LIN C1158。 THE M1068 WILL BE A ONE FOR ONE REPLACEMENT FOR M577'S IAW FOLLOWING BASIS OF ISSUE: HHC (HVY DIV) 1 PER TAC CP OPS 1 PER TAC CP INTEL HHC, BDE (HVY DIV) 1 PER TAC CP OPS 1 PER TAC CP INTEL 1 PER OPS - MAIN CP 1 PER INTEL - MAIN CP 1 PER S3 PLANS 1 PER S1/S4 DIV ARTY (HVY DIV) HHB 1 PER DIV TAC CP FSE 1 PER CAV SQDN FSE ARTILLERY BN 1 PER OPS SEC 1 PER INTEL SEC 1 PER MANEUVER BDE FSE 1 PER BN FDC 1 PER MANEUVER BN FDC 1 PER BTRY FDC MLRS BTRY 1 PER BTRY FDC 1 PER PLT FDC ENG BDE (HVY DIV) 1 PER BDE S2/S3 SEC 1 PER BDE TAC 1 PER BN OPS SEC 1 PER BN INTEL SEC ARMOR BN 1 PER S1/S4 SEC 1 PER S3 SEC 1 PER S2 SEC INF BN (MECH) 1 PER S1/S4 SEC 1 PER S3 SEC 1 PER S2 SEC MI BN (HVY DIV) 1 PER S3 SEC ARMORED CAV REG HHT 1 PER OPS SEC 1 PER TAC CP OPS 1 PER INTEL SEC 1 PER TAC CP INTEL 1 PER REG FSE 1 PER CM&D SEC 1 PER S4 SEC CAV SQDRN 1 PER SQDRN S3 1 PER SQDRN S2 1 PER SQDRN FSE 1 PER SQDRN S1/S4 ARTILLERY BATTERY 1 PER FDC HVY SEP BDE HHC 1 PER OPS SEC 1 PER ENG CO 1 PER INTEL SEC 1 PER TAC CP OPS 1 PER TAC CP INTEL 1 PER S2/S3 PLANS SEC 1 PER S4 SEC (REAR) FA BN 1 PER BDE FSE 1 PER S3 SEC 1 PER S2 SEC 1 PER BN FDC 1 PER MANEUVER BN FSE 1 PER BTRY FDC CORPS (HEAVY) HHC 2 PER G3 TAC CP 1 PER G2 TAC CP COMBAT ENG BN (M) 1 PER S2/S3 SEC ARTILLERY HHB 1 PER CORPS FSE MLRS BN 1 PER OPS/INTEL SEC 1 PER BTRY FDC 1 PER PLT FDC FA BN 155 (SP) 1 PER S3 SEC 1 PER S2 SEC 1 PER BN FDC 1 PER BTRY FDC AIR DEFENSE ARTILLERY (ADA) HHB ADA BN (HVY DIV) 1 PER S3 SECTION ADA BTRY GUN/STGR (HVY DIV) 1 PER BTRY/HQ ADA BTRY (M113/STGR) (HVY DIV) 1 PER BTRY HQ ADA BTRY (SFV-9/STGR) (HVY DIV) 1 PER BTRY HQ ADA BTRY ACR/HSB 1 PER BTRY HQ E. POWER REQUIREMENTS: NO ADDITIONAL POWER REQUIREMENTS. CARRIER WILL INITIALLY USE A 4.2 KW GENERATOR. WILL TRANSITION TO A 5 KW POWER SOURCE. F. TRANSPORTATION REQUIREMENTS: (1) GROUND: TRAILER 50T, 60T, 70T HET, RAILCAR OR BY ITS OWN POWER. (2) AIR: C141 OR C5 AIRCRAFT. G. PERSONNEL/MAINTENANCE IMPACTS: (1) OPERATORS: CREW SIZE/MOS: (A) ONE PERSON TO OPERATE CARRIER. (B) TRAINING REQUIREMENTS: TRAINING BASE PRESENTLY BEING EVALUATED. NO ADDITIONAL FORMAL TRAINING IS ANTICIPATED. (2) MAINTAINERS: (A) UL: GPU, 31U, 63Y, 63J, AND 52D. (B) DS: 29E, 41C, 43M, 44B, 52D, 63G, 63H, AND 63J. (C) GS: 35H, 41C, 43M, 44B, 52D, 63G, 63H, AND 63J. H. SPRCIAL NOTES: (1) THIS ITEM IS APPROPRIATE FOR INCLUSION IN AR 71-13. (2) ULTIMATELY 1,500 M577A2'S WILL BE RECONFIGURED.